Fieldware for Smartpad II
Software Version 4.03
Chapter 2 - Software Overview 2-7
First Time Setup Process
First Time Setup Process
The first time you start up the SmartPad II, you should also make sure that the current date and time are set correctly,
see “Set Date and Time” on page 2-29 for more details.
Power Unit On
Connect the SmartPad II to the SmartPad II Interface Cable, see Figure 2-5, and apply 12 VDC power. It is not neces-
sary to have the Lightbar or GPS receiver connected and running to change any of the settings. Power the unit up by
pressing the On switch.
Figure 2-5: Connecting SmartPad II to Swath XL / GuideLine Interface Cable
Figure 2-6: Connecting SmartPad II to CenterLine Interface Cable
Comments to this Manuals